Windfarm project Saint Brieuc

Windfarm project Saint Brieuc Project

Meprofa was assigned by windfarm Saint Brieuc to deliver components for an emergency power supply.The delivery concerns fuel storage system consisting of a composition of 2 X 15 ft containers, wich are equipped with several 10m³ stainless steel storage tanks, two times a 1m³ day tanks, 1 urea tank of 1.6m³, including associated piping. This project was done by the end of July 2021.