PIG loop system for TOTAL Lubricants

PIG loop system for TOTAL Lubricants Project

TOTAL assigned Meprofa to build en install a PIG induction loop system o grease transportsystems. Meprofa built the full 6″ loop system and installed the PIG station. This delivery was made in the third quarter of 2021.