TOTAL assigned Meprofa to build en install a PIG induction loop system o grease transportsystems. Meprofa built the full 6″ loop system and installed the PIG station. This delivery was made in the third quarter of 2021.
TOTAL assigned Meprofa to build en install a PIG induction loop system o grease transportsystems. Meprofa built the full 6″ loop system and installed the PIG station. This delivery was made in the third quarter of 2021.