Glycol water system

Glycol water system Project

Meprofa built in assagnment by a refrigeration company multiple pipe for a glycol water system. The stainless steel 316 piping system is approximately 600 meters long, and consists op pipelines from DN25 to DN200. Meprofa delivered the piping at the end of july 2021.