Meprofa had been assigned to make hydrant box installation that will be used at the Blankenburg connection. the assessment is to develop, fabricate and install the full hydrant box installation at the Blankenburg connection located in Zuid-Holland. Meprofa is not only responsible for the fabrication of the hydrent boxes and piping but Meprofa was also ask to built and install a pump installation. this project started in may 2020 and will be done in 2023.