Meprofa was assigned by windfarm Saint Brieuc to deliver components for an emergency power supply.The delivery concerns fuel storage system consisting of a composition of 2 X 15 ft containers, wich are equipped with several 10m³ stainless steel storage tanks, two times a 1m³ day tanks, 1 urea tank of 1.6m³, including associated piping. This project was done by the end of July 2021.